Section of M6 motorway to close next month as 137-metre-long bridge is replaced

The closure of a section of a major motorway could cause travel problems for people travelling home after Christmas.

A major UK motorway will close for the weekend next month as a 137-metre-long bridge is replaced - potentially causing problems for people returning home after the Christmas break. The operation will see a railway bridge over the M6, near Penrith, demolished before a new crossing is lowered into place.

Network Rail is carrying out final preparations ahead of the project, which will see the motorway closed from 8pm on Friday, January 2, until 5am on Monday, January 5 - the weekend many festive trippers will be making their journeys home.

Costing £60 million, the project will see the existing West Coast Main Line bridge between junctions 39 and 40 demolished, before being replaced with a new structure, and comes after three months of preparations. The scheme has been supported by Peacock Precision Services, with Tier 1 building and civil contractor Kilnbridge setting out the site ready for the new bridge to be manoeuvred into place.

A section of the M6 motorway will while the 137-metre-long bridge is replacedplaceholder image
A section of the M6 motorway will while the 137-metre-long bridge is replaced | Peacock Precision Services

Kieron Peacock, Peacock managing director, said: “It’s been a privilege to provide engineering services on such a major project, and an honour to be asked by Kilnbridge and Skanska to carry out this important work. It has been a real team effort working in partnership with some of the UK’s largest contractors, and everyone involved has played their part in getting the site ready in time.

“Our team makes sure everything is prepared to the exact measurements on the drawings so the bridge can be smoothly lowered into place. There is no room for error; everything needs to be accurate to the nearest millimetre. The reason Peacock Precision Services invests in the highest value engineering equipment is to guarantee the levels of precision and accuracy essential to ensuring there are no delays in high-profile projects such as this.”

The firm, founded by Kieron in 2018, operates across the UK and works across the highways, railway, housing, public sector and retail industries. The M6 project will be his 73rd of this kind.

“Replacing a bridge is typically a huge undertaking, and making sure everything is accurate to the exact scale is of paramount importance,” he added. “It is always interesting working on big projects and the new railway bridge over the M6 will benefit hundreds of rail users every day.”

During the motorway closure, National Highways will change road layouts at Junction 40 and the nearby A66 Kemplay Bank roundabout, while rail journeys will also be disrupted, with no trains running on the West Coast Main Line from Oxenholme to Carlisle between December 31 and January 15.

Related topics:
Telling news your way
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice